Pool Resurfacing Timeline: What to Expect with D&J
Resurfacing your pool is an exciting way to refresh your backyard and make your pool look beautiful again. At D&J The Pool Resurfacers, we follow a detailed, professional process to ensure your pool is safe, functional, and stunning. Here’s what the timeline typically looks like.
1. Drain the Pool
The process begins by completely draining the pool. This allows our team to inspect the surface and prepare it properly for resurfacing.
2. Demolition & Debris Removal
Next, we perform any necessary demolition and remove old materials, making the pool ready for resurfacing.
3. Surface Preparation & Bonding Coat
After demolition, the pool surface is prepared and a bonding coat is applied. This step ensures the new plaster adheres perfectly and creates a durable finish.
4. Tile Installation
If your project includes new tile, we install it at this stage. Proper tile placement ensures a clean, professional look that will last for years.
5. Plaster Application
The plaster is applied carefully across the pool surface. In some cases, polishing is done after plastering to give the pool a smooth, luxurious finish.
6. Drains and Covers Installation
Before filling the pool, we install new drains and covers to ensure everything meets safety standards and works efficiently.
7. Filling the Pool
Once all the work is complete, the pool is filled with water.
8. Startup & Chemical Balancing
Immediately after filling, we begin the startup process, which includes adding chemicals and balancing the water. This process can last up to 4 weeks, ensuring the pool is perfectly safe, clean, and ready to enjoy.
The resurfacing process typically takes about one week. It can extend to two weeks if the deck is being repaired or replaced.
At D&J The Pool Resurfacers, we manage every detail of the resurfacing process, from draining to chemical balancing. Following this timeline ensures your pool is not only stunning but also safe, durable, and ready for countless hours of enjoyment.