
Residential resurfacing
Complete pool resurfacing in Orlando
We restore your pool from the inside out: a new pebble, quartz or polished finish, new tile, and a surface smoothed by hand by our own crew.
- Hands-on work
- 3–4 days
- Start to swim-ready
- About 1½ months
- Finishes
- Pebble, quartz or polished
Quick answer
What is complete pool resurfacing, and how long does it take in Orlando?
Complete pool resurfacing replaces your pool's worn interior: the pool is drained, the old surface and tile come out where needed, and new tile and a hand-troweled pebble, quartz or polished finish go in. At D&J The Pool Resurfacers (Florida license CPC1459797) that is 3–4 days of hands-on work and about a month and a half from start to swim-ready, including the chemical start-up. Our finishes are pebble, quartz and polished.
On this page
When does a pool need resurfacing?
When the finish turns rough to the touch, stained, cracked or simply past its best years. Florida sun, heavy rain, heat, pool chemistry and year-round use wear every finish down eventually, and a complete resurfacing is the most effective way to restore the pool and extend its life for the long term.
It is also the moment to change how your pool looks. New waterline tile, a different finish color or a pebble texture can transform the whole backyard, because the interior surface is most of what you see when you look at the water.
We start with a free inspection and tell you exactly what your pool needs, in a clear quote.
What a complete resurfacing includes
- Draining the pool and removing the old surface where needed
- A manual acid wash that removes calcium buildup and brings out the final color of the new finish
- A bonding agent applied before the new surface goes on
- New tile installation
- A premium pebble, quartz or polished finish, hand-smoothed by our team
- Detailing, new fittings, refill and chemical start-up
Signs your pool needs resurfacing
Pools rarely fail overnight. They send signals first, and most of them you can check yourself in a few minutes. If you recognize two or more of these, it's worth a professional look.
- The surface feels rough, like sandpaper, and snags swimsuits or scrapes feet
- Stains keep coming back even after you adjust the chemistry or shock the pool
- Visible cracks, chips or small flakes of material at the bottom
- A chalky white powder comes off on your hand when you touch the wall
- Faded or uneven color, with lighter or grayish patches
- Exposed aggregate or bare spots in the finish
- More water loss than normal evaporation explains
- The finish is simply past its best years and the pool no longer looks like yours
How does pool resurfacing work, day by day?
3–4 days of hands-on work, then refill and the chemical start-up. About a month and a half from the first day to swim-ready. Here is the real sequence our crew follows.
Before day 1
Free inspection, quote and your choices
We inspect the shell, tile and equipment and give you a clear quote. You can visit our Orlando showroom to see tile and finish samples in person before you decide.

Day 1
Drain the pool
Draining a standard residential pool takes most of the first day. From this moment the pool is a work site and off-limits.

Days 1–2
Remove the old surface and tile, and prep the shell
We remove the old finish and tile as needed. Hollow areas, where the old finish has separated from the shell, come out completely. This chip-out is the noisiest part of the job and usually lasts one to two days. Then the manual acid wash and the bonding agent prepare the surface for the new finish.

Days 2–3
New tile goes in first
The new waterline and step tile is set before the finish, so the edges meet cleanly.

Day 3 or 4
The new finish, applied by hand in a single day
The finish goes on and is smoothed by hand with trowels across the entire surface in one day. Florida's summer heat can speed up the drying of the bonding agent, which sometimes shortens this phase.

Right after
Acid wash, detailing and new fittings
We finish the details and install new fittings. As soon as the finish is applied, the refill starts.

Days 4–6
Refill
Refilling takes 12 to 48 hours depending on the size of the pool. The new surface cures under water.
The weeks that follow
Chemical start-up
The water chemistry is balanced step by step while the finish cures. Cloudy or milky water during this phase is normal and temporary: it is dust releasing from the new surface, and it clears as the start-up progresses. No swimming yet.
About a month and a half
Swim-ready
Once the start-up is complete and the chemistry is confirmed, the pool is yours again.

Every pool is different. Size, the condition of the old surface and the weather can move a day here or there, and we tell you as soon as anything changes.

Why we acid wash by hand
Before the new finish goes on, we perform a manual acid wash. It removes calcium buildup and enhances the final color of the material, so the finish you chose is the finish you see.
Pebble, quartz or polished: which finish is right for you?
We work with three interior finishes: pebble, quartz and polished. Here is how they compare.
| Finish | Quartz | Pebble | Polished (polished pebble) |
|---|---|---|---|
| Texture | Smooth | Textured, natural small pebble | Smooth and soft, polished stone |
| Look | Solid colors with a quartz sparkle | Natural, like a riverbed | Natural, with a glossy finish |
| Approx. lifespan | 12–15 years | 15–20+ years | 15–20+ years |
| Warranty | To be confirmed | 25 years (PebbleTec) | To be confirmed |
| Investment | $ – $$ | $$ – $$$ | $$$ |
| Best for | A good cost/benefit balance | Maximum durability | Durability with a smoother feel underfoot |
Lifespans and investment ranges are general industry references, not a guarantee; we confirm them for your pool when we quote. PebbleTec carries a 25-year manufacturer warranty and can only be installed by authorized applicators like D&J.
What affects the cost of pool resurfacing in Orlando?
Every quote is prepared for your pool after we inspect it, and it is always free. These are the factors that move the number.
Pool size
A larger pool needs more material, more labor and more installation time.
Surface condition
Structural cracks, delamination or hollow areas that must be chipped out require more preparation before the new finish.
Finish selection
PebbleTec generally costs more upfront than quartz, and in exchange lasts longer.
Tile and coping
New waterline tile is part of a complete resurfacing; the tile you choose and replacing coping change the scope.
Extra upgrades
Many homeowners combine resurfacing with deck work or water features. These upgrades affect the total project budget.
How to prepare your home, and what to expect
Most delays come from access and preparation, not from the work itself. This short checklist keeps your project on schedule.
Before we arrive
- Clear furniture, umbrellas and planters from 3–4 feet around the pool
- Make sure the crew can get into the backyard on day one (gate key or code)
- Turn off irrigation zones near the pool and cover plants you want to protect
- Let your pool service know, and give your neighbors a heads-up about the chip-out noise
- If you live in an HOA, get written approval first
While we work
- The pool is off-limits from drain day until the start-up is complete
- Keep children and pets away from the work area, especially during chip-out
- You don't need to be home every day. If you travel, you can come back to a finished pool
- We clean up as part of the process and keep you in the loop
The first weeks after
- Brush walls and floor once or twice a day during the first week
- No swimming until we confirm the start-up is complete
- No automatic cleaners, rubber toys or metal accessories for the first four weeks
- Planning a party? Schedule the job to start at least a month and a half before
Why homeowners and properties choose D&J
No inflated numbers, just the things you can check before you sign.
Licensed: CPC1459797
A Florida Certified Pool/Spa Contractor license, valid statewide. Verify it yourself in under two minutes.
Verify at myfloridalicense.comCertified PebbleTec applicators
PebbleTec carries a 25-year manufacturer warranty and can only be installed by authorized applicators. We are also NPC certified and FSPA members.
Our own crew
The team that preps your pool is the team that sets the tile and hand-trowels the finish.
Meet the teamAn Orlando showroom
Serving Central Florida since 2014. Choose tile and finish in person at 5610 Carder Rd, Orlando, before anything is ordered.
Pebble, quartz and polished
Three interior finishes, applied by hand and built for Florida's sun and pool chemistry.
English and Spanish
Se habla español. We explain every step in the language you prefer, and quotes are always free.
Recent pool resurfacing in Central Florida
What our customers say
Real Google reviews, word for word. D&J is rated 4.7 on Google from 43 reviews.
Rated 5 out of 5
“From day 1 until the completion, a total of 6 days… everything was explained and schedules were kept. We highly recommend D&J.”
Doug R. · Google review Rated 5 out of 5
“We recently had D and J resurface our pool … and love our new pool! They did an amazing job and we are thrilled with the results.”
Carolyn K. · Google review Rated 5 out of 5
“I have a 20 year old pool that looks brand new … with continuous support from D&J to this day.”
Yadira P. · Google review
Where we work in Central Florida
From our Orlando showroom to Central Florida and Florida's east coast. Find your city:
- Orlando
- Kissimmee
- Winter Park
- Maitland
- Windermere
- Winter Garden
- Lake Mary
- Longwood
- Davenport
- Casselberry
- Saint Cloud
- Apopka
- Palm Bay
- Titusville
- Melbourne
Pool resurfacing questions, answered
Straight answers, based on how we actually work.
How long does a complete pool resurfacing take?
The hands-on work takes 3 to 4 days. From start to swim-ready, the full process runs about a month and a half, including the chemical start-up after the pool is refilled.
Can I use my pool during resurfacing?
No. Once the pool is drained on day one, it is off-limits until the new finish is applied, the pool is refilled and the chemical start-up is complete. Plan for about a month and a half without the pool.
Which finishes do you use?
We work with three finishes: pebble, quartz and polished. They hold up under Florida's conditions and deliver the quality our clients expect.
Does the finish come with a warranty?
PebbleTec carries a 25-year manufacturer warranty and can only be installed by authorized applicators. D&J is a certified PebbleTec applicator.
Which is better for my pool: pebble, quartz or polished?
It depends on your priorities. Quartz is smooth, with solid colors and a good cost/benefit balance. Pebble has a natural, textured feel and is the most durable. Polished keeps that durability with a smoother feel underfoot. The comparison table on this page has the details, and you can see all three in person at our Orlando showroom.
Why do you acid wash the pool first?
A manual acid wash removes calcium buildup and enhances the final color of the new material before it goes on.
How much does pool resurfacing cost in Orlando?
It depends on the size of the pool, the condition of the current surface, the finish you choose and any extras like new coping or deck work. We inspect your pool and give you a clear quote for free.
Why is my pool water cloudy after resurfacing?
During the chemical start-up, dust releases from the new surface and can make the water look cloudy or milky. It is normal and temporary, and it clears as the start-up progresses. Brushing once or twice a day in the first week helps.
Do I need HOA approval to resurface my pool?
In most Florida HOA communities, yes: resurfacing is usually treated as an exterior alteration that needs written approval before work begins. We help you prepare the documentation, including our license CPC1459797, insurance certificates, the project scope and your finish color samples.
How do I know if my pool needs resurfacing?
If the surface is rough, stained, cracking, chalky or simply past its best years, it's time to look at it. We'll inspect your pool for free and tell you exactly what it needs.
Worth reading before you decide
Pool Resurfacing Orlando FL: Cost, Process & What to Expect in 2026Read article
How Long Does Pool Resurfacing Take in Florida?Read article
Pebble Tec vs Quartz Pool Finish: Which Is Better for Florida Pools?Read article
The $50,000 Mistake Orlando Homeowners Make When Their Pool Looks BadRead article
Not sure what you want? Design it first.
Open the Pool Builder →Find out exactly what your pool needs.
We'll inspect your pool and give you a clear quote. Quotes are always free.
- License CPC1459797
- Google rating 4.7 (43 reviews)
- Se habla español













